Tuesday, December 25, 2007

Updated Plan

I have had to change various things regarding this project in terms of towers because not all towers are commercial.Privately owned towers mostly refused or never sent back any approval letters so i don't want to force anyone to do anything.The Rashid Pediatric Center were sending the faxes to buildings and we only got 39 towers. Towers will be repeated.100 towers will be scaled as i promised.If 1 tower approved i would go up and down the stairwell of that tower 100 times.

New Plan: RED(x4)
BLUE(x2)

The Dates and Lengths

Starting on the 20th of January

  1. Emirates Tower - 355 meters, 54 floors
  2. Emirates Tower
  3. Al Ghadeer Tower
  4. Al Ghadeer Tower
  5. Al Ghadeer Tower
  6. Al Ghadeer Tower
  7. Sky Tower - 24 floors
  8. Sky Tower
  9. Sky Tower
  10. Sky Tower

21st of January

  1. Ghaya Residence 34 floors
  2. Ghaya Residence
  3. Ghaya Residence
  4. Ghaya Residence
  5. Rose Rotana Tower333 meters, 72 floors
  6. Rose Rotana Tower
  7. Rose Rotana Tower
  8. Rose Rotana Tower

22nd of January

  1. Oasis Tower32 floors
  2. Bistro 21st Century Tower269 meters, 55 floors
  3. Bistro 21st Century Tower
  4. Bistro 21st Century Tower
  5. Bistro 21st Century Tower

23rd of January

  1. Dusit Dubai – 153 meters, 40 floors
  2. Dusit Dubai
  3. Dusit Dubai
  4. Dusit Dubai

I now head towards Dubai Marina

  1. Emirates Marina Hotel and Residence – 256 meters, 59 floors
  2. Emirates Marina Hotel and Residence
  3. Emirates Marina Hotel and Residence
  4. Emirates Marina Hotel and Residence
  5. Grosvners House Hotel – 48 floors, 210 meters

We continue in Marina

24th of January

  1. Habtoor Grand 1 – 109 meters, 24 floors
  2. Habtoor Grand 2
  3. Oasis Beach Tower32 floors
  4. Oasis Beach Tower
  5. Oasis Beach Tower
  6. Oasis Beach Tower
  7. La Riviera37 floors
  8. Marina Heights Tower55 floors, 208 meters
  9. Marina Residence Tower69 meters, 17 floors
  10. Al Sahab 1 Tower (located left of the 3rd signal after the Marina walk) – 44 floors

25th of January

I will now head off back to Sheikh Zayed Road in order to go up the Millenium Towers Hotel. The Hotel is located between Emirates Gold Club and Mall of The Emirates on Sheikh Zayed Road.

  1. Millenium Towers Hotel – 285 meters, 60 floors
  2. Millenium Towers Hotel
  3. Millenium Towers Hotel
  4. Millenium Towers Hotel
  5. Al Manara Tower36 floors

I will then head back towards Sheikh Zayed Road on the side heading towards Jabal Ali, opposite to the initial starting area.

Starting at the Al Manara Tower located near the Shangri-La Hotel towards the end of the service road.

  1. Shangr-La Hotel Dubai43 floors
  2. Shangr-La Hotel Dubai
  3. Shangr-La Hotel Dubai
  4. Shangr-La Hotel Dubai
  5. Al Meraikhi Tower125 meters, 32 floors

26th of January

  1. White Building – relatively small
  2. Chelsea Tower250 meters, 49 floors
  3. Chelsea Tower
  4. Chelsea Tower
  5. Chelsea Tower
  6. The Blue Building

27th of January

  1. Towers Rotana Hotel – 115 meters, 37 floors
  2. Towers Rotana Hotel
  3. Towers Rotana Hotel
  4. Towers Rotana Hotel
  5. Union Tower30 floors
  6. Union Tower
  7. Union Tower
  8. Union Tower

28th of January

  1. Saeed Tower II – 155 meters, 38 floors
  2. Saeed Tower II
  3. Saeed Tower II
  4. Saeed Tower II
  5. Al Rostamani Tower A – 16 floors
  6. Al Rostamani Tower A
  7. Al Rostamani Tower A
  8. Al Rostamani Tower A

29th of January

  1. Sahara Tower31 floors
  2. Al Safa Tower22 floors
  3. Al Safa Tower
  4. Al Safa Tower
  5. Al Safa Tower
  6. Al Wasl Tower22 floors
  7. Al Wasl Tower
  8. Al Wasl Tower
  9. Al Wasl Tower

30th of January

  1. City Tower 2 - 22 floors
  2. City Tower 2
  3. City Tower 2
  4. City Tower 2
  5. Al Durrah Tower18 floors
  6. Al Durrah Tower
  7. Al Durrah Tower
  8. Al Durrah Tower

31st of January

  1. Crown Plaza Dubai -
  2. Crown Plaza Dubai
  3. Crown Plaza Dubai
  4. Crown Plaza Dubai
  5. API World Tower130 meters, 32 floors
  6. API World Tower
  7. API World Tower
  8. API World Tower


1st of February (end)

100. Trade Center (end) – 149 meters, 39 floors

Sunday, December 16, 2007

Dubai One Interveiw

Her Say is a Program that is run On ''Dubai One'' Its a Local TV Program designed for people who live in Dubai city.

I will be Interviewed Regarding my Tower100 project and i will be answering questions so please tune in.

Useful links:http://www.dubaione.ae/program_detail.asp?PID=2402&PTID=28


check the link out for timings please.

Wednesday, December 12, 2007

Update

It has been awhile since i posted here. Quiet and very stale for myself since University is coming to an End for this semester.

The Rashid Center is busy sending Faxes to all the selected buildings so thats helping me somewhat but i feel things are slow Building managers sometimes don't reply and i think it would have been better just calling them on the day but what can i do,everything has to be done properly.


''Everything is underway i expect to start January 16th 2008 Official Date''


The plan is all the same as i previously stated(see the plan post)

I have A Meeting with some Officials From Jumeirah Group so i can talk about the Emirates towers and Burj Al Arab Tower's stair climbing events.


Ill try to post more often.